Skip to content

New MCT 111 Trail Bridge opens in Pontoon Beach

Staff, board members, local officials, and contractors cut the ribbon of the new MCT 111 Trail Bridge along the Schoolhouse Trail on Thursday, June 25.

 

MCT celebrates completion of signature bridge for the MCT Schoolhouse Trail

On Thursday, June 25, Madison County Transit (MCT) officials along with a host of contractors and local leaders, participated in a ribbon cutting ceremony for a towering new bicycle/pedestrian bridge that carries the MCT Schoolhouse Trail over IL-111 in Pontoon Beach.

Known as the MCT 111 Trail Bridge, the new 640-foot span is now open to the public and provides a seamless ADA-accessible path over the busy IL-111 intersection.

“The MCT 111 Trail Bridge is a long-term investment in safety, accessibility, and the continued growth of the MCT Trails system,” said MCT Board Chairman Al Adomite. “By adding a bridge at this location, we are making it easier and safer for trail users to connect throughout the region.”

SJ Morrison, managing director of MCT, speaks at the ribbon cutting ceremony.

The MCT 111 Trail Bridge is the 51st bridge in the MCT Trails system, emphasizing MCT’s ongoing commitment to reducing at-grade trail crossings and improving the safety and accessibility of the trails.

The $6.3 million project includes a 640-foot, three-span bridge as well as approximately 2,350 feet of improved trail. The bridge features two 200-foot prefabricated box-truss approach spans and a 240-foot signature “tied-arch” center span.

The tied-arch design is the first of its kind on the MCT Trails system and one of only a few tied-arch bicycle and pedestrian bridges in the region. At its highest point, the top of the arch in the center span rises 60 feet above the roadway, creating a striking new landmark for Madison County and the MCT Trails.

The bridge deck is 12 feet wide and constructed of 7-inch reinforced concrete. The approaches were designed with a 4.5 percent running slope from both directions, providing an ADA-compliant connection across Illinois Route 111.

“The MCT Trails system is one of Madison County’s greatest assets,” said MCT Managing Director SJ Morrison. “Projects like this ensure that the trails are safe and accessible for users of all ages and abilities. I guess you could say that MCT is going over and above for safety on the MCT Trails.”

Consultants for the project included Keeley & Sons, which served as the general contractor, and Oates Associates served as the design engineering firm. Funding was provided by Madison County Transit with financial support from the Metro East Park and Recreation District (MEPRD).

For more information about the MCT Trails, visit www.MCTtrails.org, email [email protected], or call (618) 797-4600.

Images provided by MCT.

Leave a Comment